EN | FR
EN | FR
Case Study_Asset 19

Developer Cuts Sewage Infrastructure Costs by 40% with Low-Pressure Solution

When a residential developer needed a cost-effective alternative to a traditional sewage pump station, they turned to the E/One low-pressure sewer system — a solution that delivered significant savings and long-term flexibility. Instead of investing in a costly centralized pump station, the developer adopted this innovative approach to dramatically reduce upfront infrastructure costs, meet zoning requirements, and stay prepared for future municipal upgrades.

This real-world case study shows how our experts helped:

  • Reduce per-lot infrastructure costs

  • Support phased development without delays

  • Futureproof the site for municipal connection

Want to know how we did it?
Download the case study to see the full solution, including project cost comparisons and implementation insights.

Resources

How a Residential Project Avoided a $500K Pump Station and Gained Long-term Flexibility

How a Residential Project Avoided a $500K Pump Station and Gained Long-term Flexibility

Download

Talk to one of our Experts

Reach out to our team of Spraying, Pumping, Filtering, Valve, and Systems Specialists today. We know we can help you with any municipal or industrial application challenges.